In 2000, EPG took the guide in getting ISO14001 environment administration certificate and thereafter handed the inspection of clear production and recycling economic climate, profitable the title of “Zhejiang Eco-friendly Enterprise”. Our item range also covers locking assemblies (clamping components/locking system), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, universal joint, rod ends and yokes. Our products are used in several fields.
EPT EPT EPT Wheel and Ring EPT for EPT EPTTry
one. Description
No. | Product | Description |
one | Name | EPT EPT |
2 | Dimensions | EPT can be EPT. |
three | Manufacture StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | 5-8 Grade ISO1328-1997. |
4 | EPT | 45#Steel,20CrMnTi,40Cr,20CrNiMo,20MnCr5,GCR15SiMn,42CrMo,2Cr13stainless steel,Nylon,Bakelite,Copper,Aluminium.and so forth |
five | Creation Approach | The major process is EPT Hobbing, EPT Shaping and EPT EPT, Choosing manufacturing process according to the diverse merchandise. |
6 | Warmth Therapy | Carburizing and quenching ,EPT-frequency quenching,Nitriding, Hardening and tempering, Deciding on warmth therapy in accordance to the different supplies. |
seven | Screening EPT | Rockwell hardness tester 500RA, EPTT mesh instrument EPTT-200B amp 3102,EPT measurement cEPTTr instrument CNC3906T and other EPT precision detection equipments |
eight | Certification | GB/T19001-2016/ISO9001:2015 |
9 | Use | Employed in printing EPTT, cleansing EPTT, health-related gear, XiHu (West EPT) Dis.Hu (West EPT) Dis.den EPTT, design EPTT, electric powered vehicle, valve, forklift, transportation equipment and various EPT EPTTs.and so on |
ten | Package deal | According to customer’s request |
two. Pictures
three. OrEPTTprocess
a. Consumer sends us the drawing or sample, If only sample, our company supply the CAD drawing.
b. Our company supplies the processing method and quotation.
c. Our company supplies the sample following consumer confirmed processing method and quotation.
d. Client places the orEPTTafter affirm the sample.
e. Buyer shell out 50% deposit
f. EPTtity creation.
g. Shell out the equilibrium right after the acceptance and affirmation.
h. Delivery.